Added the option to control the behaviour of the finish operation confirm in the prod. output page.
Finish prod order routing line default confirm button:
if we finish the operation from the prod. order routing output we can get a confirm message after closing the prod. order routing output page:
Work center setup:
On the fasttab Timber we have the possibility to setup up the "Finish Prod. Order Routing Line" and if this is set to "yes with confirmation" we can set the default behaviour of the confirm message. If the field is not selected the confirm message is default set to NO and if the field is selected and then the default message is set to YES.